Heavy Equipment Export, Flat Rack & Special Container Solutions

Construction machinery, mining equipment, power equipment, and heavy vehicle manufacturing, OOG and heavy-lift specialist

Last updated: June 22, 2026

Back to Heavy-Lift & Project Cargo Services
Key Takeaways
  • Specialized in OOG and heavy-lift equipment across construction machinery, mining equipment, power generation, and heavy vehicle sectors, single pieces routinely exceeding 10 tons, some up to 40+ tons
  • 4-level protective packaging system with VCI anti-rust, moisture-proof, impact-resistant, and combined protection, customized to each equipment type and transport route
  • Engineer-designed lashing plans per IMO CSS Code standards with MSL-to-calculated-force ratio of at least 1.5x, submitted to carriers for pre-approval before loading
In This Case Study
  1. Background
  2. Our Solution: One-Stop OOG/Heavy-Lift Logistics
  3. Container Selection & Engineering Assessment
  4. Lashing Plan Design & Approval
  5. Tiered Protective Packaging System
  6. Space Guarantee & Schedule Management
  7. Core Capabilities

Background

We have long-term experience serving the construction machinery, mining equipment, power equipment, and heavy vehicle manufacturing sectors. The export cargo we handle includes large-scale mining equipment, construction machinery, and industrial components, OOG (Out of Gauge) and heavy-lift cargo with single pieces ranging from several tons to over 40 tons.

The challenge is not just weight. It is the combination of extreme dimensions, irregular shapes, high centers of gravity, and precision-machined surfaces that cannot tolerate rust or impact damage during a 30+ day ocean voyage. From factory pickup to destination delivery, every step, packaging, special container selection and loading, lashing plan design and approval, crane lifting, export customs, and ocean freight, requires coordinated execution with high attention to detail. Unlike standard container cargo, OOG and heavy-lift shipments have specific requirements for container type selection, lashing engineering design, and carrier approval, this is our core area of expertise.

Our solution: one-stop oog/heavy-lift logistics

We provide the complete logistics chain from factory to destination port (or final job site):

Factory packaging → Inland transport → Special container selection & loading → Lashing plan design & approval → Crane lifting & loading → Export customs → Ocean freight → Destination discharge & delivery

The client hands over equipment at the factory gate; we manage everything through to the destination port, or the final construction site.

1. Special Container Selection & Engineering Assessment

Heavy-lift equipment cannot fit into standard containers. Each shipment requires matching to the right container type based on dimensions, weight, center of gravity, and physical profile. We provide selection assessments for each consignment:

Container TypeBest ForReference Parameters
Flat Rack (FR)Over-width, over-height, heavy equipment. No side walls; fixed or collapsible end walls. Cargo can be loaded from top, side, or end.20FR payload ~28-31T; 40FR payload ~40-45T
Open Top (OT)Tall equipment exceeding standard container door height. Removable roof; crane loading from above. Cargo height can exceed container body (tarp cover required).Suitable for vertically loaded tall equipment
Platform ContainerHeaviest or extra-long equipment. No side walls, no end walls, no roof, reinforced steel floor only.Rated lashing points on floor; suitable for separate lifting operations
Breakbulk Vessel / Ro-RoFor cargo exceeding container limits entirely.Custom solution

2. Professional Lashing Plan Design & Approval

For single pieces exceeding 10 tons, we coordinate with professional engineers to produce custom lashing plans covering:

  • Force analysis: Based on cargo weight, center of gravity, and anticipated accelerations during the voyage (longitudinal, transverse, and vertical directions) to calculate the required securing forces in each direction.
  • Lashing point planning: Identifying the number, location, and rated capacity of lashing points on both the cargo body and the container floor.
  • Securing equipment specification: Determining chain lashings, wire ropes, and turnbuckles, with MSL (Maximum Securing Load) to calculated force ratio of at least 1.5x safety factor, in accordance with the IMO Code of Safe Practice for Cargo Stowage and Securing (CSS Code).
  • Anti-slip measures: High-friction coefficient anti-slip matting between cargo and container floor to increase friction and reduce dependency on securing equipment.
  • Weather protection: Waterproof tarpaulin covering for ocean spray protection, desiccants for humidity control.

The lashing plan is submitted to the shipping line for approval before loading operations begin, significantly reducing the risk of port rejection or rework demands.

3. Tiered Protective Packaging System

We match packaging protection levels to equipment type, precision level, and transport route:

Protection LevelPackaging MethodApplication
Anti-Rust LevelVCI (Vapor Corrosion Inhibitor) anti-rust film/paper + desiccantPrecision-machined surfaces (bearing seats, hydraulic rods), exposed metal parts. VCI forms a molecular-level protective layer on metal surfaces, preventing corrosion in high-salt-spray ocean environments
Moisture-Proof LevelHeat-shrink film / waterproof wrapGeneral components requiring moisture protection but not rust prevention, providing dust protection and light waterproofing
Impact-Resistant LevelSteel/iron plate packaging + wooden crate reinforcementHeavy components, precision equipment, impact and compression protection during handling and transport
Combined ProtectionVCI anti-rust + wooden/steel crate + waterproof filmHigh-value precision equipment, multi-layer protection for 30+ day ocean voyages

4. Space Guarantee & Schedule Management

Heavy-lift cargo differs from standard container cargo, special container space is scarce and vessel configuration requirements (e.g., heavy-lift crane capability) are specific. Missing a planned sailing can mean a 1-2 week wait for the next available vessel, directly impacting overseas project timelines.

Our space reliability comes from:

  • Stable OOG special container booking relationships with major shipping lines
  • Advance project cargo space reservation (typically 4-6 weeks ahead)
  • Multi-route backup planning: 2-3 alternative routes prepared for the same destination to reduce single-route rollover risk
  • For large-scale engineering projects, we offer full-cycle project cargo management from first shipment to final delivery, helping each batch load on schedule so logistics does not impact overall project timelines

Core Capabilities

CapabilityDescription
Cargo TypeOOG out-of-gauge cargo, heavy-lift equipment, construction machinery, mining equipment
Container TypesFlat rack (20FR/40FR), Open Top (OT), Platform container, Breakbulk
Single Piece WeightRoutinely handle up to 40 tons; above that, custom breakbulk solution available
Lashing CapabilityEngineer-designed custom plans per CSS Code, carrier pre-approved
Packaging SolutionsVCI anti-rust, wooden/steel crate reinforcement, waterproof/moisture-proof tiered protection
Service ModelFactory to destination port full-chain, project logistics full-cycle management
40T+
single piece capacity
4
container types
4
packaging levels
6-week
advance booking
About the Author: Li Wei is Project Cargo Director at Great Hensen International Logistics, with 15+ years of experience managing heavy-lift, OOG, and complex project shipments from Chinese ports to global destinations.